| Looking west at the installation. July 2004 |
|
| The font of the plotting room. Collapsed wooden power shelter in front. July 2004 |
|
| The roof. There would originally have been more fill covering the structure. July 2004 |
|
| Looking into the entry area. July 2004 |
|
| Looking south inside the plotting room. July 2004 |
|
| Looking northwest in the plotting room, switchboard room at right. July 2004 |
|
| Looking northeast at the switchboard room. July 2004 |
|
| Detail of plaque on the oil heater. July 2004 |
|
| Detail of telephone equipment in the switchboard room. July 2004 |
|
|
|